One of the most significant bottlenecks in perpetuating the offshore wind industry throughout the U.S. has been the need for wind turbine installation vessels (WTIVs).
The Cadeler fleet consists of two WTIVs on the water, two WTIVs scheduled for delivery in Q3/2024 and Q2/2025, and two wind foundation installation vessels scheduled for delivery in Q4/2025 and Q3/2026.
The Cadeler fleet consists of two WTIVs on the water, two WTIVs scheduled for delivery in Q3/2024 and Q2/2025, and two wind foundation installation vessels scheduled for delivery in Q4/2025 and Q3/2026.